Groundworks

 

Picture 1 - The greenhouse insulated foundation wall, complete with outer paving slabs for protection from vermin.

Pictures 2, 3 & 4 - The in situ concrete septic tank.

Work progressed very rapidly from a hole in the ground to ... a finished structure in need of backfilling and preparing for the two manhole covers as Frank is seen doing.

In the finished garden, these covers are concealed by removable paving slabs.

Square Donate Button
All donations are very much appreciated. Thank you. This project has been undertaken without UK government or EU funding.

Digital StillCamera

1

Digital StillCamera

2

Digital StillCamera

3

Digital StillCamera

4

Digital StillCamera

5

6

Picture 5 – Construction of the linear rainwater soakway to the south of the house. Not visible are the lengths of waste pipe which make up most of the soakaway’s volume and help it to contain enough stormwater. This ‘debris’ was topped with the small amount of crushed stone left over from constructing the septic tank leachfield.

6 – The high-quality surplus subsoil from excavating the house foundations, septic tank and foul and surface water drainage was eventually placed in a mound next to the road, followed by the topsoil. It serves as a combined noise barrier and shrub garden. Initially one pile looked more like this.

All material on this website © EAA 2015 onwards.
Except where otherwise stated, material on this website is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives4.0 International License.
You may copy and share the material with full attribution but you may not alter it, sell it or use it commerc­ially. If you are in any doubt, please contact the copyright holder first.